ITAC Assessment: AS0385
ITAC logo
ITAC Assessment: AS0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum sows
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 1,000,000
ft2
Annual Production 139,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,039 4,031,304
kWh
Electricity Demand $12,984 8,323
kW-mo/yr
Electricity Fees $19,120 -
Natural Gas $836,445 101,147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $21,304 $10,000 - - $21,304
-
MMBtu
- -
02 3.1161: Eliminate/reduce an operation $151,757 $37,000 $(-6,572.0)
(-149,370)
kWh
$(-1,541.0)
-
kW-mo/yr
- $65,700
-
MMBtu
$94,170
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $59,563 $24,322 $48,251
1,096,612
kWh
$11,312
-
kW-mo/yr
- - -
04 3.5112: Reprocess spent oils on site for re-use $42,444 $17,685 $(-1,734.0)
(-39,420)
kWh
$(-407.0)
-
kW-mo/yr
$44,585
-
MMBtu
- -
05 2.6218: Turn off equipment when not in use $719 $506 $719
16,377
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $383 $30 $310
7,058
kWh
$73
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,939 $60 $2,382
54,147
kWh
$557
-
kW-mo/yr
- - -
08 2.2136: Install / repair insulation on steam lines $339 $150 - - $339
-
MMBtu
- -
TOTAL RECOMMENDED $279,448 $89,753 $43,356
985,404
kWh
$9,994
-
kW-mo/yr
$66,228
-
MMBtu
$65,700
-
MMBtu
$94,170
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs