ITAC Assessment: NC0293
ITAC logo
ITAC Assessment: NC0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printed catalog inserts
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 31,071
ft2
Annual Production 700,000,000
pieces
Production Hrs. Annual 6,720
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,324 3,997,200
kWh
Electricity Demand $81,271 8,729
kW-mo/yr
Electricity Fees $16,679 -
Natural Gas $143,640 17,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $9,068 $23,100 n/a $(-393.0)
(-25,066)
kWh
$(-417.0)
-
kW-mo/yr
$9,878
-
MMBtu
-
02 2.7313: Recycle air for heating, ventilation and air conditioning $4,884 $6,553 n/a $357
22,783
kWh
- $4,527
-
MMBtu
-
03 4.514: Re-arrange equipment layout to reduce handling costs $3,750 $5,400 n/a - - - $3,750
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,131 $2,418 n/a $1,034
65,961
kWh
$1,097
-
kW-mo/yr
- -
05 2.7241: Install outside air damper / economizer on hvac unit $2,869 $10,000 n/a $2,869
183,062
kWh
- - -
06 2.6218: Turn off equipment when not in use $1,981 $730 n/a $1,981
126,043
kWh
- - -
07 2.6218: Turn off equipment when not in use $752 $1,000 n/a $752
48,000
kWh
- - -
TOTAL RECOMMENDED $25,435 $49,201 $6,600
420,783
kWh
$680
-
kW-mo/yr
$14,405
-
MMBtu
$3,750
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs