Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Secondary smelting and refining of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0200 #08 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $440 $100
AM0200 #07 Y:1993 Use most efficient type of electric motors $340 $460
AM0200 #06 Y:1993 Use synthetic lubricant $480 -
AM0200 #05 Y:1993 Minimize water usage $1,250 $100
AM0200 #04 Y:1993 Re-size charging openings or add a movable door on equipment $1,380 $710
AM0200 #03 Y:1993 Replace city water with recycled water via cooling tower $3,950 $2,550
AM0200 #02 Y:1993 Use waste heat from hot flue gases to preheat $12,040 $17,000
AM0200 #01 Y:1993 Use waste heat from hot flue gases to preheat $17,100 $17,000
AM0182 #05 Y:1993 Use most efficient type of electric motors $200 $413
AM0182 #04 Y:1993 Make a practice of turning off lights when not needed $1,070 -
AM0182 #03 Y:1993 Optimize plant power factor $16,650 $46,600
AM0182 #02 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $15,800 $600
AM0182 #01 Y:1993 Change rate schedules or other changes in utility service $94,480 -
AM0160 #10 Y:1992 Reduce illumination to minimum necessary levels $910 -
AM0160 #09 Y:1992 Pay utility bills on time $1,665 -
AM0160 #08 Y:1992 Utilize higher efficiency lamps and/or ballasts $2,305 $4,080
AM0160 #07 Y:1992 Eliminate or reduce compressed air usage $2,320 $6,850
AM0160 #06 Y:1992 Utilize higher efficiency lamps and/or ballasts $2,325 -
AM0160 #05 Y:1992 Establish equipment maintenance schedule $6,360 -
AM0160 #04 Y:1992 Use most efficient type of electric motors $1,348 $595