Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary smelting and refining of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2609 #08 Y:2026 Reduce ventilation air $4,550 $7,067
UC2609 #07 Y:2026 Purchase equipment instead of leasing $192,000 $160,000
UC2609 #06 Y:2026 Install occupancy sensors $2,973 $10,400
UC2609 #05 Y:2026 Insulate bare equipment $1,484 $3,900
UC2609 #04 Y:2026 Install / repair insulation on steam lines $796 $2,333
UC2609 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $5,514 -
UC2609 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $630 $325
UC2609 #01 Y:2026 Install compressor air intakes in coolest locations $8,428 $3,524
LT8432 #03 Y:2025 Turn off equipment when not in use $5,440 $1,807
LT8432 #02 Y:2025 Utilize energy-efficient belts and other improved mechanisms $7,598 $812
LT8432 #01 Y:2025 Turn off equipment when not in use $3,990 $545
LT8409 #03 Y:2024 Repair and eliminate steam leaks $38,478 $2,971
LT8409 #02 Y:2024 Use waste heat from hot flue gases to preheat $38,595 $8,887
LT8409 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $27,962 $23,656
UU0256 #04 Y:2024 Reduce excessive boiler blowdown $5,024 $7,960
UU0256 #03 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,048 $11,730
UU0256 #02 Y:2024 Optimize plant power factor $14,319 $31,625
UU0256 #01 Y:2024 Use / purchase optimum sized compressor $43,875 $401,481
AS0565 #07 Y:2023 Install timers on light switches in little used areas $454 $720
AS0565 #06 Y:2023 Conserve energy by efficient use of vending machines $617 $312