Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary smelting and refining of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8409 #04 Y:2024 Improve combustion control capability $1,787 $3,324
LT8409 #03 Y:2024 Repair and eliminate steam leaks $38,478 $2,971
LT8409 #02 Y:2024 Use waste heat from hot flue gases to preheat $38,595 $8,887
LT8409 #01 Y:2024 Use computer programs to optimize hvac performance $26,176 $20,332
UU0256 #04 Y:2024 Reduce excessive boiler blowdown $5,024 $7,960
UU0256 #03 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,048 $11,730
UU0256 #02 Y:2024 Optimize plant power factor $14,319 $31,625
UU0256 #01 Y:2024 Use / purchase optimum sized compressor $43,875 $401,481
AS0565 #07 Y:2023 Install timers on light switches in little used areas $454 $720
AS0565 #06 Y:2023 Conserve energy by efficient use of vending machines $617 $312
AS0565 #05 Y:2023 Install heat pipes / raise cooling setpoint $1,336 $75
AS0565 #04 Y:2023 Use computer programs to optimize hvac performance $1,687 $3,351
AS0565 #03 Y:2023 Replace fossil fuel equipment with electrical equipment $89,587 $918,750
AS0565 #02 Y:2023 Use solar heat to make electricty $139,376 $1,265,613
AS0565 #01 Y:2023 Apply for tax-free status for energy purchases $583,260 $500
MA0827 #07 Y:2021 Insulate bare equipment $801 $1,550
MA0827 #06 Y:2021 Minimize water usage $1,374 $3,230
MA0827 #05 Y:2021 Use cooling tower or economizer to replace chiller cooling $2,962 $10,800
MA0827 #04 Y:2021 Meter recycled water (to reduce sewer charges) $5,685 $2,000
MA0827 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $6,022 $11,050