Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

306

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel investment foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0220 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,624 $4,000
IP0220 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $5,726 $12,000
IP0220 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,424 $12,100
IP0220 #03 Y:2026 Eliminate or reduce compressed air usage $13,177 $14,000
IP0220 #02 Y:2026 Upgrade controls on compressors $564 $500
IP0220 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,222 $40
UU0282 #10 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,520 $9,240
UU0282 #09 Y:2025 Air condition only space necessary $1,130 $2,230
UU0282 #08 Y:2025 Insulate bare equipment $3,030 $15,460
UU0282 #07 Y:2025 Turn off equipment when not in use $9,350 $3,000
UU0282 #06 Y:2025 Preheat combustion air with waste heat $3,270 $22,800
UU0282 #05 Y:2025 Install compressor air intakes in coolest locations $790 $5,550
UU0282 #04 Y:2025 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,300 $2,900
UU0282 #03 Y:2025 Change rate schedules or other changes in utility service $12,800 $9,600
UU0282 #02 Y:2025 Purchase gas directly from a contract gas supplier $21,900 $12,000
UU0282 #01 Y:2025 Hire energy manager $11,100 $4,800
AS0603 #07 Y:2025 Conserve energy by efficient use of vending machines $478 $246
AS0603 #06 Y:2025 Install timers on light switches in little used areas $1,156 $949
AS0603 #05 Y:2025 Install vinyl strip / high speed / air curtain doors $1,172 $545
AS0603 #04 Y:2025 Pay bills on time to avoid late fees $18,772 $291