306
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Steel investment foundries | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0220 #06 Y:2026 | 06 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,624 | $4,000 |
n/a
|
| IP0220 #05 Y:2026 | 05 | 2026 | Recover heat from exhausted steam, hot air or hot water | $5,726 | $12,000 |
n/a
|
| IP0220 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $9,424 | $12,100 |
n/a
|
| IP0220 #03 Y:2026 | 03 | 2026 | Eliminate or reduce compressed air usage | $13,177 | $14,000 |
n/a
|
| IP0220 #02 Y:2026 | 02 | 2026 | Upgrade controls on compressors | $564 | $500 |
n/a
|
| IP0220 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $1,222 | $40 |
n/a
|
| UU0282 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,520 | $9,240 | |
| UU0282 #09 Y:2025 | 09 | 2025 | Air condition only space necessary | $1,130 | $2,230 | |
| UU0282 #08 Y:2025 | 08 | 2025 | Insulate bare equipment | $3,030 | $15,460 | |
| UU0282 #07 Y:2025 | 07 | 2025 | Turn off equipment when not in use | $9,350 | $3,000 | |
| UU0282 #06 Y:2025 | 06 | 2025 | Preheat combustion air with waste heat | $3,270 | $22,800 | |
| UU0282 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $790 | $5,550 | |
| UU0282 #04 Y:2025 | 04 | 2025 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $7,300 | $2,900 | |
| UU0282 #03 Y:2025 | 03 | 2025 | Change rate schedules or other changes in utility service | $12,800 | $9,600 | |
| UU0282 #02 Y:2025 | 02 | 2025 | Purchase gas directly from a contract gas supplier | $21,900 | $12,000 | |
| UU0282 #01 Y:2025 | 01 | 2025 | Hire energy manager | $11,100 | $4,800 | |
| AS0603 #07 Y:2025 | 07 | 2025 | Conserve energy by efficient use of vending machines | $478 | $246 | |
| AS0603 #06 Y:2025 | 06 | 2025 | Install timers on light switches in little used areas | $1,156 | $949 | |
| AS0603 #05 Y:2025 | 05 | 2025 | Install vinyl strip / high speed / air curtain doors | $1,172 | $545 | |
| AS0603 #04 Y:2025 | 04 | 2025 | Pay bills on time to avoid late fees | $18,772 | $291 |