Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

290

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel investment foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0603 #07 Y:2025 Conserve energy by efficient use of vending machines $478 $246
AS0603 #06 Y:2025 Install timers on light switches in little used areas $1,156 $949
AS0603 #05 Y:2025 Install vinyl strip / high speed / air curtain doors $1,172 $545
AS0603 #04 Y:2025 Pay bills on time to avoid late fees $18,772 $291
AS0603 #03 Y:2025 Use solar heat to make electricty $172,434 $1,040,663
AS0603 #02 Y:2025 Use adsorption, ion exchange to remove contaminants $279,654 $313,240
AS0603 #01 Y:2025 Initiate a program to acquire iso certification $320,000 $104,670
WM0237 #05 Y:2024 Install occupancy sensors $894 $349
WM0237 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,999 -
WM0237 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,168 $1,487
WM0237 #02 Y:2024 Replace boiler $6,383 $56,908
WM0237 #01 Y:2024 Eliminate or reduce compressed air usage $9,320 $3,350
IC0315 #11 Y:2024 Use direct flame impingement or infrared processing for chamber type heating $12,134 $7,693
IC0315 #10 Y:2024 Use direct flame impingement or infrared processing for chamber type heating $369,968 $14,366
IC0315 #09 Y:2024 Recharge batteries on during off-peak demand periods $2,224 -
IC0315 #08 Y:2024 Use or replace with energy efficient substitutes $525 $242
IC0315 #07 Y:2024 Eliminate or reduce compressed air usage $14,991 $7,497
IC0315 #06 Y:2024 Install occupancy sensors $1,133 $1,850
IC0315 #05 Y:2024 Insulate bare equipment $6,223 $2,225
IC0315 #04 Y:2024 Install compressor air intakes in coolest locations $1,069 $442