ITAC Assessment: WM0237
ITAC logo
ITAC Assessment: WM0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Investment castings
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 1,100,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,098 2,566,536
kWh
Electricity Demand $153,096 11,840
kW-mo/yr
Electricity Fees $60,199 -
Natural Gas $128,292 18,492
MMBtu
Waste Disposal Costs
Water Usage $20,300 2,400
Tgal
TOTAL YEARLY COSTS $500,985
RECOMMENDED SAVINGS* $20,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $9,320 $3,350 $2,361
43,726
kWh
$6,959
-
kW-mo/yr
-
02 2.1224: Replace boiler $6,383 $56,908 - - $6,383
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,168 $1,487 $1,633
30,237
kWh
$536
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,999 - $1,505
27,879
kWh
$494
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $894 $349 $584
10,810
kWh
$310
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,764 $62,094 $6,083
112,652
kWh
$8,298
-
kW-mo/yr
$6,383
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs