| Assessment Year | 2025 |
|---|---|
| Principal Product | Investment castings |
| NAICS | 331512: Steel Investment Foundries |
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
100,000
ft2
|
| Annual Production | 1,100,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $139,098 | 2,566,536 |
kWh
|
$0.054 | |
| Electricity Demand | $153,096 | 11,840 |
kW-mo/yr
|
$12.93 | |
| Electricity Fees | $60,199 | - |
|
- | |
| Natural Gas | $128,292 | 18,492 |
MMBtu
|
$6.94 | |
| Waste Disposal Costs | |||||
| Water Usage | $20,300 | 2,400 |
Tgal
|
$8.46 | |
| TOTAL YEARLY COSTS | $500,985 | ||||
| RECOMMENDED SAVINGS* | $20,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $9,320 | $3,350 |
$2,361
43,726
kWh
|
$6,959
-
kW-mo/yr
|
- | |
| 02 | 2.1224: Replace boiler | $6,383 | $56,908 | - | - |
$6,383
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,168 | $1,487 |
$1,633
30,237
kWh
|
$536
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,999 | - |
$1,505
27,879
kWh
|
$494
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $894 | $349 |
$584
10,810
kWh
|
$310
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $20,764 | $62,094 |
$6,083
112,652
kWh
|
$8,298
-
kW-mo/yr
|
$6,383
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs