36
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Gray and ductile iron foundries | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DS0048 #10 Y:1996 | 10 | 1996 | Meter recycled water (to reduce sewer charges) | $14,032 | $1,350 | |
| DS0048 #09 Y:1996 | 09 | 1996 | Replace city water with recycled water via cooling tower | $34,241 | $40,760 | |
| DS0048 #08 Y:1996 | 08 | 1996 | Use flow control valves on equipment to optimize water use | $26,694 | $160 | |
| DS0048 #07 Y:1996 | 07 | 1996 | Recover waste heat from equipment | $5,733 | $6,500 | |
| DS0048 #06 Y:1996 | 06 | 1996 | Insulate bare equipment | $4,640 | $3,678 | |
| DS0048 #05 Y:1996 | 05 | 1996 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,128 | $250 | |
| DS0048 #04 Y:1996 | 04 | 1996 | Install compressor air intakes in coolest locations | $5,971 | $750 | |
| DS0048 #03 Y:1996 | 03 | 1996 | Use most efficient type of electric motors | $5,919 | $18,845 | |
| DS0048 #02 Y:1996 | 02 | 1996 | Utilize higher efficiency lamps and/or ballasts | $7,486 | $18,021 | |
| DS0048 #01 Y:1996 | 01 | 1996 | Optimize plant power factor | $1,037 | $1,900 | |
| DS0015 #06 Y:1994 | 06 | 1994 | Insulate bare equipment | $50 | $241 | |
| DS0015 #05 Y:1994 | 05 | 1994 | Insulate bare equipment | $249 | $257 | |
| DS0015 #04 Y:1994 | 04 | 1994 | Use most efficient type of electric motors | $5,343 | $13,182 | |
| DS0015 #03 Y:1994 | 03 | 1994 | Install compressor air intakes in coolest locations | $1,378 | $744 | |
| DS0015 #02 Y:1994 | 02 | 1994 | Install occupancy sensors | $590 | $200 | |
| DS0015 #01 Y:1994 | 01 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,981 | $4,356 |