ITAC Assessment: DS0015
ITAC logo
ITAC Assessment: DS0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Custom Manufactured Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 58,421
ft2
Annual Production 20,000
ton
Production Hrs. Annual 5,720
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,430 13,027,550
kWh
Natural Gas $77,587 18,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,292

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,981 $4,356 $1,981
42,497
kWh
-
02 2.7135: Install occupancy sensors $590 $200 $590
12,603
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,378 $744 $1,378
29,601
kWh
-
04 2.4133: Use most efficient type of electric motors $5,343 $13,182 $5,343
114,596
kWh
-
05 2.2511: Insulate bare equipment $249 $257 - $249
-
MMBtu
06 2.2511: Insulate bare equipment $50 $241 - $50
-
MMBtu
TOTAL RECOMMENDED $9,591 $18,980 $9,292
199,297
kWh
$299
-
MMBtu
TOTAL IMPLEMENTED $9,292 $18,482 $9,292
199,297
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs