Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,126

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gray and ductile iron foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0214 #14 Y:2025 Utilize higher efficiency lamps and/or ballasts $15,911 $51,915
IP0214 #13 Y:2025 Replace boiler $29,619 $95,000
IP0214 #12 Y:2025 Standardize motor inventory $23,673 $53,888
IP0214 #11 Y:2025 Recover waste heat from equipment $2,076 $3,485
IP0214 #10 Y:2025 Upgrade conveyors $4,792 $7,500
IP0214 #09 Y:2025 Use radiant heater for spot heating $9,756 $12,559
IP0214 #08 Y:2025 Use fog nozzles / spray rinsing instead of immersion rinsing $9,428 $9,599
IP0214 #07 Y:2025 Reduce or eliminate waste $562,500 $561,997
IP0214 #06 Y:2025 Reduce space conditioning during non-working hours $1,932 $646
IP0214 #05 Y:2025 Turn off equipment during breaks, reduce operating time $7,935 $2,485
IP0214 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $38,034 $3,500
IP0214 #03 Y:2025 Eliminate or reduce compressed air usage $10,561 $243
IP0214 #02 Y:2025 Develop a repair/replace policy $2,655 -
IP0214 #01 Y:2025 Convert to electrostatic powder coating $114,298 -
UA0295 #06 Y:2025 Use radiant heater for spot heating $6,661 $23,010
UA0295 #05 Y:2025 Install occupancy sensors $454 $2,418
UA0295 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,442 $4,771
UA0295 #03 Y:2025 Upgrade controls on compressors $85,871 $42,000
UA0295 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $62,000 $8,591
UA0295 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $36,113 $1,750