36
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Cold-rolled steel sheet, strip, and bars | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0332 #10 Y:2011 | 10 | 2011 | Utilize higher efficiency lamps and/or ballasts | $706 | $4,580 | |
| LE0332 #09 Y:2011 | 09 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $3,360 | $6,400 | |
| LE0332 #08 Y:2011 | 08 | 2011 | Reduce the pressure of compressed air to the minimum required | $3,829 | $40 | |
| LE0332 #07 Y:2011 | 07 | 2011 | Develop standard operating procedures | $6,689 | - | |
| LE0332 #06 Y:2011 | 06 | 2011 | Install vinyl strip / high speed / air curtain doors | $7,328 | $23,400 | |
| LE0332 #05 Y:2011 | 05 | 2011 | Use / purchase optimum sized compressor | $8,856 | $28,000 | |
| LE0332 #04 Y:2011 | 04 | 2011 | Install occupancy sensors | $9,659 | $24,370 | |
| LE0332 #03 Y:2011 | 03 | 2011 | Improve air circulation with destratification fans / other methods | $12,677 | $25,375 | |
| LE0332 #02 Y:2011 | 02 | 2011 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $16,976 | $7,660 | |
| LE0332 #01 Y:2011 | 01 | 2011 | Use solar heat to make electricty | $66,813 | - | |
| WV0347 #11 Y:2006 | 11 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $457 | $158 | |
| WV0347 #10 Y:2006 | 10 | 2006 | Install compressor air intakes in coolest locations | $915 | $245 | |
| WV0347 #09 Y:2006 | 09 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,051 | $65 | |
| WV0347 #08 Y:2006 | 08 | 2006 | Use radiant heater for spot heating | $5,557 | $2,790 | |
| WV0347 #07 Y:2006 | 07 | 2006 | Install vinyl strip / high speed / air curtain doors | $5,696 | $10,600 | |
| WV0347 #06 Y:2006 | 06 | 2006 | Eliminate or reduce compressed air usage | $6,834 | $250 | |
| WV0347 #05 Y:2006 | 05 | 2006 | Utilize a less expensive cooling method | $10,012 | $13,815 | |
| WV0347 #04 Y:2006 | 04 | 2006 | Develop a repair/replace policy | $10,908 | $504 | |
| WV0347 #03 Y:2006 | 03 | 2006 | Establish a predictive maintenance program | $11,796 | $1,000 | |
| WV0347 #02 Y:2006 | 02 | 2006 | Use waste heat from flue gases to heat space conditioning air | $32,512 | $24,300 |