Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel wiredrawing and steel nails and spikes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UK1801 #11 Y:2017 Utilize energy-efficient belts and other improved mechanisms $2,054 -
UK1801 #10 Y:2017 Preheat combustion air with waste heat $3,756 $5,475
UK1801 #09 Y:2017 Preheat combustion air with waste heat $3,865 $5,895
UK1801 #08 Y:2017 Insulate bare equipment $3,719 $1,526
UK1801 #07 Y:2017 Insulate bare equipment $8,475 $2,977
UK1801 #06 Y:2017 Install compressor air intakes in coolest locations $860 $1,250
UK1801 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $13,263 $2,190
UK1801 #04 Y:2017 Do not use compressed air for personal cooling $23,118 $11,500
UK1801 #03 Y:2017 Meter recycled water (to reduce sewer charges) $26,076 $3,990
UK1801 #02 Y:2017 Install occupancy sensors $2,773 $1,959
UK1801 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $27,208 $48,400
OK0961 #14 Y:2017 Use or replace with energy efficient substitutes $497,839 $3,000,000
OK0961 #13 Y:2017 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $311,801 $1,832,665
OK0961 #12 Y:2017 Reuse rich white water in other applications $523,580 $500,000
OK0961 #11 Y:2017 Size electric motors for peak operating efficiency $44,544 $8,817
OK0961 #10 Y:2017 Cover open tanks $27,427 $3,900
OK0961 #09 Y:2017 Use cooling tower or economizer to replace chiller cooling $50,374 $124,000
OK0961 #08 Y:2017 Use or replace with energy efficient substitutes $12,104 $792
OK0961 #07 Y:2017 Use or replace with energy efficient substitutes $216,378 $7,000
OK0961 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $831 $3,220