23
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Steel wiredrawing and steel nails and spikes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0418 #15 Y:2012 | 15 | 2012 | Move product using mechanical means | $12,870 | $20,000 | |
| BD0418 #14 Y:2012 | 14 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,121 | $1,225 | |
| BD0418 #13 Y:2012 | 13 | 2012 | Recover waste heat from equipment | $1,210 | $1,500 | |
| BD0418 #12 Y:2012 | 12 | 2012 | Install compressor air intakes in coolest locations | $2,527 | $500 | |
| BD0418 #11 Y:2012 | 11 | 2012 | Install occupancy sensors | $2,653 | $1,200 | |
| BD0418 #10 Y:2012 | 10 | 2012 | Reduce the pressure of compressed air to the minimum required | $3,117 | $20 | |
| BD0418 #09 Y:2012 | 09 | 2012 | Install skylights | $5,048 | $12,215 | |
| BD0418 #08 Y:2012 | 08 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,441 | $600 | |
| BD0418 #07 Y:2012 | 07 | 2012 | Recover waste heat from equipment | $5,842 | $6,000 | |
| BD0418 #06 Y:2012 | 06 | 2012 | Use photocell controls | $18,400 | $14,100 | |
| BD0418 #05 Y:2012 | 05 | 2012 | Replace obsolete burners with more efficient ones | $23,015 | $48,000 | |
| BD0418 #04 Y:2012 | 04 | 2012 | Recover waste heat from equipment | $26,689 | $30,000 | |
| BD0418 #03 Y:2012 | 03 | 2012 | Use radiant heater for spot heating | $60,134 | $105,100 | |
| BD0418 #02 Y:2012 | 02 | 2012 | Utilize higher efficiency lamps and/or ballasts | $64,077 | $313,924 | |
| BD0418 #01 Y:2012 | 01 | 2012 | Install / repair insulation on steam lines | $147,427 | $200,000 | |
| IA0489 #08 Y:2012 | 08 | 2012 | Reduce ventilation air | $5,734 | $1,725 | |
| IA0489 #07 Y:2012 | 07 | 2012 | Optimize plant power factor | $8,468 | $3,237 | |
| IA0489 #06 Y:2012 | 06 | 2012 | Install compressor air intakes in coolest locations | $4,423 | $1,091 | |
| IA0489 #05 Y:2012 | 05 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,029 | $532 | |
| IA0489 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $9,978 | $13,325 |