Assessment Year | 2012 |
---|---|
Principal Product | welded wire fabric |
NAICS | 331222: Steel Wire Drawing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
180,000
ft2
|
Annual Production | 50,000
ton
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $349,217 | 10,924,200 |
kWh
|
$0.032 |
Electricity Demand | $223,735 | 24,592 |
kW-mo/yr
|
$9.10 |
Electricity Fees | $27,820 | - |
|
- |
Natural Gas | $264,387 | 71,904 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,082 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,668 | $385 |
$1,051
32,639
kWh
|
$617
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $336 | $298 |
$336
10,416
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,582 | $12,659 |
$2,937
91,188
kWh
|
$1,645
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,978 | $13,325 |
$7,285
226,215
kWh
|
$2,693
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,029 | $532 |
$2,580
80,046
kWh
|
$1,449
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $4,423 | $1,091 |
$2,854
88,604
kWh
|
$1,569
-
kW-mo/yr
|
- | |
07 | 2.3212: Optimize plant power factor | $8,468 | $3,237 | - | - | $8,468 | |
08 | 2.7314: Reduce ventilation air | $5,734 | $1,725 |
$3,675
114,138
kWh
|
$2,059
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $39,218 | $33,252 |
$20,718
643,246
kWh
|
$10,032
-
kW-mo/yr
|
$8,468 | ||
TOTAL IMPLEMENTED | $29,082 | $29,630 |
$19,667
610,607
kWh
|
$9,415
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs