Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonmetallic mineral products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0367 #12 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $5,318 $11,290
SF0367 #11 Y:2008 Utilize controls to operate equipment only when needed $14,022 $18,000
SF0367 #10 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $7,802 $10,433
SF0367 #09 Y:2008 Utilize controls to operate equipment only when needed $11,030 $7,537
SF0367 #08 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $21,234 $9,745
SF0367 #07 Y:2008 Install occupancy sensors $9,914 $1,497
SF0367 #06 Y:2008 Utilize controls to operate equipment only when needed $14,633 $1,078
SF0367 #05 Y:2008 Install timers and/or thermostats $1,679 $143
SF0367 #04 Y:2008 Turn off equipment when not in use $360 -
SF0367 #03 Y:2008 Use optimum size and capacity equipment $16,340 $5,460
SF0367 #02 Y:2008 Use optimum size and capacity equipment $121,210 $720
SF0367 #01 Y:2008 Use optimum size and capacity equipment $169,502 $10,920
DL0023 #07 Y:2008 Install compressor air intakes in coolest locations $590 $150
DL0023 #06 Y:2008 Reduce the pressure of compressed air to the minimum required $1,400 $500
DL0023 #05 Y:2008 Utilize higher efficiency lamps and/or ballasts $9,500 $22,600
DL0023 #04 Y:2008 Relocate oven / furnace to more efficient location $31,000 $26,000
DL0023 #03 Y:2008 Turn off equipment when not in use $6,900 -
DL0023 #02 Y:2008 Purchase gas directly from a contract gas supplier $8,300 -
DL0023 #01 Y:2008 Turn off equipment when not in use $26,000 -