Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonmetallic mineral products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0110 #06 Y:2001 Optimize plant power factor $1,526 $3,780
SU0110 #05 Y:2001 Disconnect ballasts $65 -
SU0110 #04 Y:2001 Reduce illumination to minimum necessary levels $2,023 $90
SU0110 #03 Y:2001 Minimize water usage $51,680 $1,605
SU0110 #02 Y:2001 Reduce the pressure of compressed air to the minimum required $13,180 $2,241
SU0110 #01 Y:2001 Combine utility meters $5,085 -
RU0088 #09 Y:1990 Replace electrically-operated equipment with fossil fuel equipment $7,926 $13,500
RU0088 #08 Y:1990 Install / repair insulation on condensate lines $265 $156
RU0088 #07 Y:1990 Analyze flue gas for proper air/fuel ratio $2,543 -
RU0088 #06 Y:1990 Change rate schedules or other changes in utility service $109,585 $50,000
RU0088 #05 Y:1990 Improve lubrication practices $16,127 $800
RU0088 #04 Y:1990 Reduce the pressure of compressed air to the minimum required $8,127 -
RU0088 #03 Y:1990 Eliminate leaks in inert gas and compressed air lines/ valves $851 $650
RU0088 #02 Y:1990 Install compressor air intakes in coolest locations $2,045 $68
RU0088 #01 Y:1990 Utilize energy-efficient belts and other improved mechanisms $3,114 -