16
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Minerals and earths, ground or otherwise treated | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0463 #06 Y:2018 | 06 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $3,345 | $14,020 | |
| SU0463 #05 Y:2018 | 05 | 2018 | Use waste heat from hot flue gases to preheat | $3,314 | $8,600 | |
| SU0463 #04 Y:2018 | 04 | 2018 | Install compressor air intakes in coolest locations | $1,966 | $4,800 | |
| SU0463 #03 Y:2018 | 03 | 2018 | Use or replace with energy efficient substitutes | $29,334 | $68,970 | |
| SU0463 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $27,444 | $22,334 | |
| SU0463 #01 Y:2018 | 01 | 2018 | Install occupancy sensors | $3,799 | $2,040 | |
| SU0273 #10 Y:2008 | 10 | 2008 | Minimize water usage | $133,075 | $550,000 | |
| SU0273 #09 Y:2008 | 09 | 2008 | Optimize plant power factor | $3,954 | $14,012 | |
| SU0273 #08 Y:2008 | 08 | 2008 | Conserve energy by efficient use of vending machines | $108 | $191 | |
| SU0273 #07 Y:2008 | 07 | 2008 | Utilize higher efficiency lamps and/or ballasts | $6,553 | $10,014 | |
| SU0273 #06 Y:2008 | 06 | 2008 | Utilize higher efficiency lamps and/or ballasts | $221 | $141 | |
| SU0273 #05 Y:2008 | 05 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $631 | $44 | |
| SU0273 #04 Y:2008 | 04 | 2008 | Install compressor air intakes in coolest locations | $3,737 | $128 | |
| SU0273 #03 Y:2008 | 03 | 2008 | Install soft-start to eliminate nuisance trips | $84,581 | $7,850 | |
| SU0273 #02 Y:2008 | 02 | 2008 | Use synthetic lubricant | $3,284 | - | |
| SU0273 #01 Y:2008 | 01 | 2008 | Reduce the pressure of compressed air to the minimum required | $3,597 | - |