ITAC Assessment: SU0273
ITAC logo
ITAC Assessment: SU0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Ferrite Powder
NAICS 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 28,700
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,984 6,090,532
kWh
Electricity Demand $195,088 11,242
kW-mo/yr
Electricity Fees $7,344 -
Natural Gas $1,117,711 166,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $239,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $235,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,597 - $2,889
29,784
kWh
$708
-
kW-mo/yr
- - - -
02 2.4314: Use synthetic lubricant $3,284 - $2,642
3,284
kWh
$642
-
kW-mo/yr
- - - -
03 2.4112: Install soft-start to eliminate nuisance trips $84,581 $7,850 - $84,581
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $3,737 $128 $3,008
31,010
kWh
$729
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $631 $44 $510
5,256
kWh
$121
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $221 $141 $94
964
kWh
$23
-
kW-mo/yr
- - - $104
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,553 $10,014 $5,269
54,312
kWh
$1,284
-
kW-mo/yr
- - - -
08 2.6211: Conserve energy by efficient use of vending machines $108 $191 $108
1,117
kWh
- - - - -
09 2.3212: Optimize plant power factor $3,954 $14,012 - - $3,954 - - -
10 3.4151: Minimize water usage $133,075 $550,000 - - - $126,846
-
MMBtu
$6,229
-
gal
-
TOTAL RECOMMENDED $239,741 $582,380 $14,520
125,727
kWh
$88,088
-
kW-mo/yr
$3,954 $126,846
-
MMBtu
$6,229
-
gal
$104
TOTAL IMPLEMENTED $235,815 $582,048 $11,429
93,862
kWh
$87,357
-
kW-mo/yr
$3,954 $126,846
-
MMBtu
$6,229
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs