Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Abrasive products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0190 #05 Y:2010 Clean or color roof to reduce solar load $1,758 $4,871
MI0190 #04 Y:2010 Use direct air supply to exhaust hoods $2,587 $700
MI0190 #03 Y:2010 Install vinyl strip / high speed / air curtain doors $2,721 $2,507
MI0190 #02 Y:2010 Insulate glazing, walls, ceilings, and roofs $4,171 $2,804
MI0190 #01 Y:2010 Lower temperature during the winter season and vice-versa $11,345 $1,020
UF0254 #10 Y:2000 Add equipment/ operators to reduce production bottleneck $65,000 $12,000
UF0254 #09 Y:2000 Install sensors to detect defects $53,501 $5,465
UF0254 #08 Y:2000 Install equipment (eg compactor) to reduce disposal costs $32,500 $22,020
UF0254 #07 Y:2000 Recover and reuse waste material $73,125 $100,000
UF0254 #06 Y:2000 Apply for tax-free status for energy purchases $7,529 $50
UF0254 #05 Y:2000 Do not use compressed air for personal cooling $1,420 $1,212
UF0254 #04 Y:2000 Insulate bare equipment $8,849 $2,975
UF0254 #03 Y:2000 Utilize higher efficiency lamps and/or ballasts $3,374 $3,223
UF0254 #02 Y:2000 Use most efficient type of electric motors $140,156 $26,813
UF0254 #01 Y:2000 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $288,146 $1,200,000