ITAC Assessment: UF0254
ITAC logo
ITAC Assessment: UF0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Clay and Industrial Sand
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 87,000,000
ft2
Annual Production 250,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,851 9,574,150
kWh
Electricity Demand $160,786 29,347
kW-mo/yr
Natural Gas $590,800 172,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $673,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $288,146 $1,200,000 - $288,146
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $140,156 $26,813 $54,730
1,765,533
kWh
$85,426
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,374 $3,223 $2,410
62,134
kWh
$964
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $8,849 $2,975 - - $8,849
-
MMBtu
- -
05 2.4238: Do not use compressed air for personal cooling $1,420 $1,212 $1,420
30,188
kWh
- - - -
06 2.8121: Apply for tax-free status for energy purchases $7,529 $50 - - - - $7,529
07 3.5311: Recover and reuse waste material $73,125 $100,000 - - - $73,125
-
lb
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $32,500 $22,020 - - - $32,500
-
lb
-
09 4.126: Install sensors to detect defects $53,501 $5,465 - - - $53,501
-
lb
-
10 4.111: Add equipment/ operators to reduce production bottleneck $65,000 $12,000 - - - $65,000
-
lb
-
TOTAL RECOMMENDED $673,600 $1,373,758 $58,560
1,857,855
kWh
$374,536
-
kW-mo/yr
$8,849
-
MMBtu
$224,126
-
lb
$7,529
TOTAL IMPLEMENTED $161,328 $34,273 $58,560
1,857,855
kWh
$86,390
-
kW-mo/yr
$8,849
-
MMBtu
- $7,529
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs