Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete, gypsum, and plaster products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0898 #13 Y:2014 Replace treated water with well / surface water $10,867 $27,400
OK0898 #12 Y:2014 Use or replace with energy efficient substitutes $20,273 $45,000
OK0898 #11 Y:2014 Purchase new equipment to reduce material use / cost $89,952 $75,900
OK0898 #10 Y:2014 Use optimum thickness insulation $6,545 $27,400
OK0898 #09 Y:2014 Insulate bare equipment $90 $178
OK0898 #08 Y:2014 Replace hydraulic / pneumatic equipment with electric equipment $1,045 $1,060
OK0898 #07 Y:2014 Install compressor air intakes in coolest locations $136 $463
OK0898 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,345 $5,971
OK0898 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $4,300 $11,014
OK0898 #04 Y:2014 Clean and maintain refrigerant condensers and towers $303 $270
OK0898 #03 Y:2014 Recover waste heat from equipment $1,132 $1,689
OK0898 #02 Y:2014 Install set-back timers $3,689 $1,965
OK0898 #01 Y:2014 Use radiant heater for spot heating $12,191 $15,000
OK0641 #07 Y:2002 Use optimum thickness insulation $194,258 $42,750
OK0641 #06 Y:2002 Replace dc equipment with ac equipment $47,600 $71,935
OK0641 #05 Y:2002 Install occupancy sensors $265 $350
OK0641 #04 Y:2002 Optimize plant power factor $2,661 $8,000
OK0641 #03 Y:2002 Change rate schedules or other changes in utility service $36,000 $64,800
OK0641 #02 Y:2002 Install set-back timers $1,658 $238
OK0641 #01 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $49,032 $32,834