ITAC Assessment: OK0641
ITAC logo
ITAC Assessment: OK0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Calcium Oxide
NAICS
n/a
SIC 3274: Lime
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area
n/a
Annual Production 361,200
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,307 13,998,600
kWh
Electricity Demand $106,029 3,500
kW-mo/yr
Electricity Fees $252 -
Natural Gas $200,927 49,230
MMBtu
Coal $2,000,000 1,196,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $331,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $194,258

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,032 $32,834 n/a $44,979
820,822
kWh
$4,053
-
kW-mo/yr
- - - -
02 2.6232: Install set-back timers $1,658 $238 - - $1,658
-
MMBtu
- - -
03 2.8114: Change rate schedules or other changes in utility service $36,000 $64,800 n/a - - - - $36,000 -
04 2.3212: Optimize plant power factor $2,661 $8,000 n/a $2,661
72,511
kWh
- - - - -
05 2.7135: Install occupancy sensors $265 $350 $265
7,207
kWh
- - - - -
06 2.3311: Replace dc equipment with ac equipment $47,600 $71,935 n/a - - - $30,000 - $17,600
07 2.2515: Use optimum thickness insulation $194,258 $42,750 - - $194,258
-
MMBtu
- - -
TOTAL RECOMMENDED $331,474 $220,907 $47,905
900,540
kWh
$4,053
-
kW-mo/yr
$195,916
-
MMBtu
$30,000 $36,000 $17,600
TOTAL IMPLEMENTED $194,258 $42,750 - - $194,258
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs