24
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Glass products, made of purchased glass | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1037 #09 Y:2022 | 09 | 2022 | Utilize higher efficiency lamps and/or ballasts | $2,006 | $6,975 | |
| UD1037 #08 Y:2022 | 08 | 2022 | Eliminate or reduce compressed air usage | $16,275 | $14,400 | |
| UD1037 #07 Y:2022 | 07 | 2022 | Eliminate or reduce compressed air usage | $5,245 | - | |
| UD1037 #06 Y:2022 | 06 | 2022 | Install compressor air intakes in coolest locations | $657 | $1,500 | |
| UD1037 #05 Y:2022 | 05 | 2022 | Install isolation transformer on adjustable frequency drive | $26,903 | $30,000 | |
| UD1037 #04 Y:2022 | 04 | 2022 | Install automatic stack damper | $4,890 | $2,000 | |
| UD1037 #03 Y:2022 | 03 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $1,323 | - | |
| UD1037 #02 Y:2022 | 02 | 2022 | Turn off equipment during breaks, reduce operating time | $3,378 | - | |
| UD1037 #01 Y:2022 | 01 | 2022 | Turn off equipment during breaks, reduce operating time | $5,459 | - | |
| UD0614 #05 Y:2001 | 05 | 2001 | Turn off equipment when not in use | $6,252 | - | |
| UD0614 #04 Y:2001 | 04 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $10,036 | - | |
| UD0614 #03 Y:2001 | 03 | 2001 | Use closed cycle process to minimize waste water production | $11,618 | $23,000 | |
| UD0614 #02 Y:2001 | 02 | 2001 | Replace existing equipment with more suitable substitutes | $53,184 | $30,570 | |
| UD0614 #01 Y:2001 | 01 | 2001 | Increase use of automation | $277,500 | $100,000 | |
| UD0409 #03 Y:1993 | 03 | 1993 | Install timers and/or thermostats | $1,251 | $450 | |
| UD0409 #02 Y:1993 | 02 | 1993 | Reduce illumination to minimum necessary levels | $676 | $2,471 | |
| UD0409 #01 Y:1993 | 01 | 1993 | Reschedule plant operations or reduce load to avoid peaks | $3,772 | - | |
| UD0245 #04 Y:1987 | 04 | 1987 | Use waste heat from hot flue gases to preheat | $3,625 | $6,000 | |
| UD0245 #03 Y:1987 | 03 | 1987 | Install / repair insulation on condensate lines | $329 | $425 | |
| UD0245 #02 Y:1987 | 02 | 1987 | Utilize higher efficiency lamps and/or ballasts | $5,498 | $1,600 |