Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Glass products, made of purchased glass
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1037 #09 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,006 $6,975
UD1037 #08 Y:2022 Eliminate or reduce compressed air usage $16,275 $14,400
UD1037 #07 Y:2022 Eliminate or reduce compressed air usage $5,245 -
UD1037 #06 Y:2022 Install compressor air intakes in coolest locations $657 $1,500
UD1037 #05 Y:2022 Install isolation transformer on adjustable frequency drive $26,903 $30,000
UD1037 #04 Y:2022 Install automatic stack damper $4,890 $2,000
UD1037 #03 Y:2022 Utilize energy-efficient belts and other improved mechanisms $1,323 -
UD1037 #02 Y:2022 Turn off equipment during breaks, reduce operating time $3,378 -
UD1037 #01 Y:2022 Turn off equipment during breaks, reduce operating time $5,459 -
UD0614 #05 Y:2001 Turn off equipment when not in use $6,252 -
UD0614 #04 Y:2001 Reschedule plant operations or reduce load to avoid peaks $10,036 -
UD0614 #03 Y:2001 Use closed cycle process to minimize waste water production $11,618 $23,000
UD0614 #02 Y:2001 Replace existing equipment with more suitable substitutes $53,184 $30,570
UD0614 #01 Y:2001 Increase use of automation $277,500 $100,000
UD0409 #03 Y:1993 Install timers and/or thermostats $1,251 $450
UD0409 #02 Y:1993 Reduce illumination to minimum necessary levels $676 $2,471
UD0409 #01 Y:1993 Reschedule plant operations or reduce load to avoid peaks $3,772 -
UD0245 #04 Y:1987 Use waste heat from hot flue gases to preheat $3,625 $6,000
UD0245 #03 Y:1987 Install / repair insulation on condensate lines $329 $425
UD0245 #02 Y:1987 Utilize higher efficiency lamps and/or ballasts $5,498 $1,600