Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

351

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pressed and blown glass and glassware, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0238 #10 Y:2006 Install occupancy sensors $86 $127
SU0238 #09 Y:2006 Utilize higher efficiency lamps and/or ballasts $477 $730
SU0238 #08 Y:2006 Use closed cycle process to minimize waste water production $3,018 $1,094
SU0238 #07 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,210 $264
SU0238 #06 Y:2006 Install compressor air intakes in coolest locations $3,073 $578
SU0238 #05 Y:2006 Disconnect ballasts $788 -
SU0238 #04 Y:2006 Use synthetic lubricant $1,534 -
SU0238 #03 Y:2006 Reduce the pressure of compressed air to the minimum required $6,431 -
SU0238 #02 Y:2006 Reduce temperature of process equipment when on standby $55,282 -
SU0238 #01 Y:2006 Turn off equipment when not in use $98,366 -
NC0337 #14 Y:2006 Make a practice of turning off lights when not needed $1,138 $200
NC0337 #13 Y:2006 Add area lighting switches $524 $1,200
NC0337 #12 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,986 $50
NC0337 #11 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,266 $3,139
NC0337 #10 Y:2006 Install / repair insulation on steam lines $846 $700
NC0337 #09 Y:2006 Reschedule plant operations or reduce load to avoid peaks $2,941 -
NC0337 #08 Y:2006 Recover heat from exhausted steam, hot air or hot water $16,069 $19,441
NC0337 #07 Y:2006 Recover heat from exhausted steam, hot air or hot water $23,249 $11,746
NC0337 #06 Y:2006 Analyze flue gas for proper air/fuel ratio $2,350 $3,430
NC0337 #05 Y:2006 Re-arrange equipment layout to reduce handling costs $10,650 $5,000