351
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Pressed and blown glass and glassware, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0238 #10 Y:2006 | 10 | 2006 | Install occupancy sensors | $86 | $127 | |
| SU0238 #09 Y:2006 | 09 | 2006 | Utilize higher efficiency lamps and/or ballasts | $477 | $730 | |
| SU0238 #08 Y:2006 | 08 | 2006 | Use closed cycle process to minimize waste water production | $3,018 | $1,094 | |
| SU0238 #07 Y:2006 | 07 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,210 | $264 | |
| SU0238 #06 Y:2006 | 06 | 2006 | Install compressor air intakes in coolest locations | $3,073 | $578 | |
| SU0238 #05 Y:2006 | 05 | 2006 | Disconnect ballasts | $788 | - | |
| SU0238 #04 Y:2006 | 04 | 2006 | Use synthetic lubricant | $1,534 | - | |
| SU0238 #03 Y:2006 | 03 | 2006 | Reduce the pressure of compressed air to the minimum required | $6,431 | - | |
| SU0238 #02 Y:2006 | 02 | 2006 | Reduce temperature of process equipment when on standby | $55,282 | - | |
| SU0238 #01 Y:2006 | 01 | 2006 | Turn off equipment when not in use | $98,366 | - | |
| NC0337 #14 Y:2006 | 14 | 2006 | Make a practice of turning off lights when not needed | $1,138 | $200 | |
| NC0337 #13 Y:2006 | 13 | 2006 | Add area lighting switches | $524 | $1,200 | |
| NC0337 #12 Y:2006 | 12 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,986 | $50 | |
| NC0337 #11 Y:2006 | 11 | 2006 | Utilize higher efficiency lamps and/or ballasts | $3,266 | $3,139 | |
| NC0337 #10 Y:2006 | 10 | 2006 | Install / repair insulation on steam lines | $846 | $700 | |
| NC0337 #09 Y:2006 | 09 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $2,941 | - | |
| NC0337 #08 Y:2006 | 08 | 2006 | Recover heat from exhausted steam, hot air or hot water | $16,069 | $19,441 | |
| NC0337 #07 Y:2006 | 07 | 2006 | Recover heat from exhausted steam, hot air or hot water | $23,249 | $11,746 | |
| NC0337 #06 Y:2006 | 06 | 2006 | Analyze flue gas for proper air/fuel ratio | $2,350 | $3,430 | |
| NC0337 #05 Y:2006 | 05 | 2006 | Re-arrange equipment layout to reduce handling costs | $10,650 | $5,000 |