Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0682 #09 Y:2025 Install occupancy sensors $5,195 $2,979
SD0682 #08 Y:2025 Change method of deionized water production $3,324 $3,000
SD0682 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $177 $678
SD0682 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $1,149 -
SD0682 #05 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $838 $1,400
SD0682 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,476 $14,316
SD0682 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,348 $7,257
SD0682 #02 Y:2025 Use battery storage for demand control $613,937 $43,189
SD0682 #01 Y:2025 Use solar heat to make electricty $15,536 $28,350
SF0634 #09 Y:2025 Use photocell controls $585 $1,248
SF0634 #08 Y:2025 Heat water with exhaust heat $9,559 $18,756
SF0634 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,856 $6,881
SF0634 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,362 $8,453
SF0634 #05 Y:2025 Recharge batteries on during off-peak demand periods $3,706 $2,070
SF0634 #04 Y:2025 Utilize controls to operate equipment only when needed $55,964 $17,866
SF0634 #03 Y:2025 Eliminate or reduce compressed air usage $25,314 $6,300
SF0634 #02 Y:2025 Turn off equipment when not in use $11,091 -
SF0634 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,190 -
LE0588 #08 Y:2024 Install occupancy sensors $38 $140
LE0588 #07 Y:2024 Replace obsolete burners with more efficient ones $175,084 $635,000