Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0652 #07 Y:2026 Replace city water with recycled water via cooling tower $111,329 $388,045
SF0652 #06 Y:2026 Use photocell controls $2,716 $12,669
SF0652 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $7,632 $21,317
SF0652 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $313 $462
SF0652 #03 Y:2026 Recharge batteries on during off-peak demand periods $4,938 $5,263
SF0652 #02 Y:2026 Reduce space conditioning during non-working hours $5,780 $4,983
SF0652 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $21,138 $7,872
SD0682 #09 Y:2025 Install occupancy sensors $5,195 $2,979
SD0682 #08 Y:2025 Change method of deionized water production $3,324 $3,000
SD0682 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $177 $678
SD0682 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $1,149 -
SD0682 #05 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $838 $1,400
SD0682 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $17,195 $14,316
SD0682 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,348 $7,257
SD0682 #02 Y:2025 Use battery storage for demand control $613,937 $43,189
SD0682 #01 Y:2025 Use solar heat to make electricty $15,536 $28,350
SF0634 #09 Y:2025 Use photocell controls $585 $1,248
SF0634 #08 Y:2025 Heat water with exhaust heat $9,559 $18,756
SF0634 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,856 $6,881
SF0634 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,362 $8,453