Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,740

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Stone, clay, glass, and concrete products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0332 #09 Y:2025 Upgrade controls on compressors $1,012 $5,000
TT0332 #08 Y:2025 Initiate a program to acquire iso certification $3,379 $15,000
TT0332 #07 Y:2025 Recover waste heat from equipment $867 $3,000
TT0332 #06 Y:2025 Turn off equipment when not in use $206 $200
TT0332 #05 Y:2025 Eliminate or reduce compressed air usage $2,283 $1,000
TT0332 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,645 $1,825
TT0332 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,989 $960
TT0332 #02 Y:2025 Turn off equipment when not in use $1,541 $120
TT0332 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $726 $30
NT0042 #06 Y:2025 Apply for tax-free status for energy purchases $19,525 $5,000
NT0042 #05 Y:2025 Lower temperature during the winter season and vice-versa $1,625 $603
NT0042 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $28,561 -
NT0042 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,317 $5,609
NT0042 #02 Y:2025 Install occupancy sensors $146 $142
NT0042 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,093 $2,408
UU0269 #08 Y:2025 Use photocell controls $267 $267
UU0269 #07 Y:2025 Install occupancy sensors $176 $390
UU0269 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $230 $263
UU0269 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $372
UU0269 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,845 $13,786