45
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OK0755 #10 Y:2007 | 10 | 2007 | Lower temperature during the winter season and vice-versa | $1,540 | - | |
OK0755 #09 Y:2007 | 09 | 2007 | Utilize higher efficiency lamps and/or ballasts | $258 | $150 | |
OK0755 #08 Y:2007 | 08 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $482 | $1,000 | |
OK0755 #07 Y:2007 | 07 | 2007 | Install occupancy sensors | $960 | $2,000 | |
OK0755 #06 Y:2007 | 06 | 2007 | Utilize higher efficiency lamps and/or ballasts | $1,008 | $28,144 | |
OK0755 #05 Y:2007 | 05 | 2007 | Begin a practice of predictive / preventative maintenance | $3,400 | - | |
OK0755 #04 Y:2007 | 04 | 2007 | Insulate glazing, walls, ceilings, and roofs | $15 | $21 | |
OK0755 #03 Y:2007 | 03 | 2007 | Install compressor air intakes in coolest locations | $399 | $160 | |
OK0755 #02 Y:2007 | 02 | 2007 | Recover waste heat from equipment | $949 | $2,196 | |
OK0755 #01 Y:2007 | 01 | 2007 | Reduce the pressure of compressed air to the minimum required | $1,231 | $4,120 | |
TA0012 #06 Y:2001 | 06 | 2001 | Install occupancy sensors | $770 | $260 | |
TA0012 #05 Y:2001 | 05 | 2001 | Install occupancy sensors | $920 | $130 | |
TA0012 #04 Y:2001 | 04 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,300 | $300 | |
TA0012 #03 Y:2001 | 03 | 2001 | Install vinyl strip / high speed / air curtain doors | $4,500 | $9,450 | |
TA0012 #02 Y:2001 | 02 | 2001 | Utilize higher efficiency lamps and/or ballasts | $5,435 | - | |
TA0012 #01 Y:2001 | 01 | 2001 | Recharge batteries on during off-peak demand periods | $14,730 | - | |
AS0119 #07 Y:1994 | 07 | 1994 | Utilize higher efficiency lamps and/or ballasts | $138 | $140 | |
AS0119 #06 Y:1994 | 06 | 1994 | Install occupancy sensors | $295 | $438 | |
AS0119 #05 Y:1994 | 05 | 1994 | Utilize higher efficiency lamps and/or ballasts | $9,018 | $10,881 | |
AS0119 #04 Y:1994 | 04 | 1994 | Turn off equipment during breaks, reduce operating time | $469 | $250 |