ITAC Assessment: AS0119
ITAC logo
ITAC Assessment: AS0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Leather & Vinyl Products
NAICS
n/a
SIC 3199: Leather Goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 34,000
ft2
Annual Production 2,400
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,070 501,172
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $945 $350 $945
11,137
kWh
02 2.7444: Close holes and openings in building such as broken windows $574 $700 $574
6,741
kWh
03 2.7234: Use heat pump for space conditioning $3,935 $15,000 $3,935
45,721
kWh
04 2.6212: Turn off equipment during breaks, reduce operating time $469 $250 $469
5,569
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,018 $10,881 $9,018
104,924
kWh
06 2.7135: Install occupancy sensors $295 $438 $295
3,517
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $138 $140 $138
1,758
kWh
TOTAL RECOMMENDED $15,374 $27,759 $15,374
179,367
kWh
TOTAL IMPLEMENTED $5,487 $15,740 $5,487
64,185
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs