Assessment Year | 1990 |
---|---|
Principal Product | MACHINE SHOP JOBS |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 642
pieces
|
Production Hrs. Annual | 4,832
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,672 | 3,633,060 |
kWh
|
$0.062 |
Natural Gas | $44,235 | 8,690 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,756 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $31,894 | $22,000 |
$31,894
732,708
kWh
|
- | |
02 | 2.6232: Install set-back timers | $8,700 | $450 |
$8,700
195,487
kWh
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $6,807 | $7,920 |
$6,807
152,989
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $2,870 | $3,160 | - |
$2,870
-
MMBtu
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,260 | $675 |
$2,260
38,394
kWh
|
- | |
06 | 2.4312: Improve lubrication practices | $670 | - |
$670
15,240
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $715 | $500 |
$715
16,120
kWh
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $580 | $270 | - |
$580
-
MMBtu
|
|
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $260 | - |
$260
5,862
kWh
|
- | |
TOTAL RECOMMENDED | $54,756 | $34,975 |
$51,306
1,156,800
kWh
|
$3,450
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,756 | $34,975 |
$51,306
1,156,800
kWh
|
$3,450
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs