ITAC Assessment: ND0028
ITAC logo
ITAC Assessment: ND0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELECTROPLATE PLASTICS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,687 3,534,584
kWh
Natural Gas $110,683 46,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $22,480 $6,144 - $22,480
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $7,023 $1,400 - $7,023
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,513 $520 $3,513
71,512
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $3,441 $1,000 $3,441
70,047
kWh
- -
05 2.4133: Use most efficient type of electric motors $531 $3,830 $531
10,844
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,181 $311 $1,526
31,067
kWh
- $(-345.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $107 $208 $107
2,052
kWh
- -
TOTAL RECOMMENDED $38,276 $13,413 $9,118
185,522
kWh
$29,503
-
MMBtu
$(-345.0)
TOTAL IMPLEMENTED $8,773 $5,869 $9,118
185,522
kWh
- $(-345.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs