Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0381 #03 Y:1996 Hire additional personnel to reduce changeout time $2,000 -
MA0381 #02 Y:1996 Install sensors to detect and avoid jams $21,374 $1,500
MA0381 #01 Y:1996 Install system to collect scrap $62,985 $16,000
MA0342 #10 Y:1995 Reduce space conditioning during non-working hours $326 $711
MA0342 #09 Y:1995 Install outside air damper / economizer on hvac unit $547 $1,500
MA0342 #08 Y:1995 Utilize energy-efficient belts and other improved mechanisms $797 -
MA0342 #07 Y:1995 Install compressor air intakes in coolest locations $1,776 $725
MA0342 #06 Y:1995 Improve air circulation with destratification fans / other methods $2,705 $7,770
MA0342 #05 Y:1995 Recover waste heat from equipment $3,525 $3,443
MA0342 #04 Y:1995 Reduce the pressure of compressed air to the minimum required $3,836 -
MA0342 #03 Y:1995 Use cooling tower water instead of refrigeration $5,090 $25,000
MA0342 #02 Y:1995 Reschedule plant operations or reduce load to avoid peaks $10,510 -
MA0342 #01 Y:1995 Optimize plant power factor $10,527 $8,100
MA0272 #08 Y:1993 Install / repair insulation on condensate lines $31 $67
MA0272 #07 Y:1993 Insulate bare equipment $6,765 $167
MA0272 #06 Y:1993 Analyze flue gas for proper air/fuel ratio $726 $400
MA0272 #05 Y:1993 Use adjustable frequency drive or multiple speed motors on existing system $4,077 $5,694
MA0272 #04 Y:1993 Utilize energy-efficient belts and other improved mechanisms $10,797 -
MA0272 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $13,507 $12,663
MA0272 #02 Y:1993 Eliminate or reduce compressed air usage $3,741 $68