41
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Laminated plastics plate, sheet, and profile shapes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0317 #16 Y:2011 | 16 | 2011 | Install occupancy sensors | $153 | $1,000 | |
| LE0317 #15 Y:2011 | 15 | 2011 | Install occupancy sensors | $1,097 | $2,035 | |
| LE0317 #14 Y:2011 | 14 | 2011 | Analyze flue gas for proper air/fuel ratio | $4,029 | $20,000 | |
| LE0317 #13 Y:2011 | 13 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,553 | $2,440 | |
| LE0317 #12 Y:2011 | 12 | 2011 | Install compressor air intakes in coolest locations | $6,001 | $4,500 | |
| LE0317 #11 Y:2011 | 11 | 2011 | Reschedule plant operations or reduce load to avoid peaks | $7,938 | $3,000 | |
| LE0317 #10 Y:2011 | 10 | 2011 | Recover waste heat from equipment | $8,358 | $870 | |
| LE0317 #09 Y:2011 | 09 | 2011 | Replace existing equipment with more suitable substitutes | $8,387 | $8,000 | |
| LE0317 #08 Y:2011 | 08 | 2011 | Replace existing equipment with more suitable substitutes | $11,375 | $100,000 | |
| LE0317 #07 Y:2011 | 07 | 2011 | Recover waste heat from equipment | $12,721 | $22,000 | |
| LE0317 #06 Y:2011 | 06 | 2011 | Repair or replace steam traps | $23,321 | $4,200 | |
| LE0317 #05 Y:2011 | 05 | 2011 | Recover heat from exhausted steam, hot air or hot water | $24,299 | $75,000 | |
| LE0317 #04 Y:2011 | 04 | 2011 | Use outside cold water source as a supply of cooling water | $28,496 | $10,000 | |
| LE0317 #03 Y:2011 | 03 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $57,617 | $13,469 | |
| LE0317 #02 Y:2011 | 02 | 2011 | Recover heat from exhausted steam, hot air or hot water | $185,253 | $118,000 | |
| LE0317 #01 Y:2011 | 01 | 2011 | Replace boiler | $284,580 | $500,000 | |
| LE0301 #16 Y:2010 | 16 | 2010 | Install timers and/or thermostats | $153 | $1,000 | |
| LE0301 #15 Y:2010 | 15 | 2010 | Install occupancy sensors | $1,097 | $2,035 | |
| LE0301 #14 Y:2010 | 14 | 2010 | Analyze flue gas for proper air/fuel ratio | $4,029 | $20,000 | |
| LE0301 #13 Y:2010 | 13 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,550 | $2,440 |