Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,601

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0516 #09 Y:1994 Turn off equipment during breaks, reduce operating time $161 $345
TN0516 #08 Y:1994 Insulate bare equipment $601 $430
TN0516 #07 Y:1994 Utilize higher efficiency lamps and/or ballasts $952 $796
TN0516 #06 Y:1994 Install compressor air intakes in coolest locations $1,597 $460
TN0516 #05 Y:1994 Turn off equipment when not in use $2,022 $3,735
TN0516 #04 Y:1994 Insulate bare equipment $14,244 $2,200
TN0516 #03 Y:1994 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,822 $26,900
TN0516 #02 Y:1994 Reduce space conditioning during non-working hours $24,983 $1,750
TN0516 #01 Y:1994 Turn off equipment when not in use $81,008 $114,200
UL0105 #05 Y:1994 Cover open tanks $1,989 $1,257
UL0105 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $6,566 $14,705
UL0105 #03 Y:1994 Insulate bare equipment $1,017 $204
UL0105 #02 Y:1994 Utilize energy-efficient belts and other improved mechanisms $6,179 $5,631
UL0105 #01 Y:1994 Use most efficient type of electric motors $24,656 $34,630
OD0003 #05 Y:1994 Use adjustable frequency drive or multiple speed motors on existing system $717 $1,365
OD0003 #04 Y:1994 Insulate bare equipment $402 $705
OD0003 #03 Y:1994 Analyze flue gas for proper air/fuel ratio $558 $200
OD0003 #02 Y:1994 Make a practice of turning off lights when not needed $2,032 $1,925
OD0003 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $8,798 $29,976
WV0034 #06 Y:1994 Use adjustable frequency drive or multiple speed motors on existing system $1,063 $2,000