Assessment Year | 1994 |
---|---|
Principal Product | Extruded rubber and plastic automotive weather stripping |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 560 |
Plant Area |
190,000
ft2
|
Annual Production | 720,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $838,506 | 16,665,006 |
kWh
|
$0.050 |
Natural Gas | $117,805 | 13,370 |
MMBtu
|
$8.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $138,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,229 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $81,008 | $114,200 |
$81,008
1,620,164
kWh
|
- | |
02 | 2.7224: Reduce space conditioning during non-working hours | $24,983 | $1,750 | - |
$24,983
-
MMBtu
|
|
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,822 | $26,900 |
$12,822
256,448
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $14,244 | $2,200 |
$14,244
284,877
kWh
|
- | |
05 | 2.6218: Turn off equipment when not in use | $2,022 | $3,735 |
$2,022
40,445
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,597 | $460 |
$1,597
31,946
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $952 | $796 |
$952
19,050
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $601 | $430 |
$601
12,016
kWh
|
- | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $161 | $345 |
$161
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $138,390 | $150,816 |
$113,407
2,268,170
kWh
|
$24,983
-
MMBtu
|
||
TOTAL IMPLEMENTED | $138,229 | $150,471 |
$113,246
2,264,946
kWh
|
$24,983
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs