Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AR0124 #10 Y:1997 Install automatic packing equipment $26,000 $2,500
AR0124 #09 Y:1997 Use a less expensive method of waste removal $3,514 -
AR0124 #08 Y:1997 Use flow control valves on equipment to optimize water use $950 $100
AR0124 #07 Y:1997 Use most efficient type of electric motors $1,103 $1,238
AR0124 #06 Y:1997 Install compressor air intakes in coolest locations $376 $100
AR0124 #05 Y:1997 Utilize energy-efficient belts and other improved mechanisms $1,903 -
AR0124 #04 Y:1997 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,617 $100
AR0124 #03 Y:1997 Reduce illumination to minimum necessary levels $2,547 $605
AR0124 #02 Y:1997 Utilize higher efficiency lamps and/or ballasts $2,334 $586
AR0124 #01 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $757 $120
AR0097 #08 Y:1996 Minimize water usage $1,489 $1,000
AR0097 #07 Y:1996 Eliminate or reduce compressed air usage $13,027 $4,900
AR0097 #06 Y:1996 Optimize plant power factor $5,388 $1,000
AR0097 #05 Y:1996 Utilize energy-efficient belts and other improved mechanisms $929 -
AR0097 #04 Y:1996 Use cooling tower water instead of refrigeration $25,240 $20,000
AR0097 #03 Y:1996 Reduce illumination to minimum necessary levels $7,972 $1,745
AR0097 #02 Y:1996 Use most efficient type of electric motors $6,496 $11,870
AR0097 #01 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $2,485 $120
AR0091 #12 Y:1996 Modify material application methods $45,625 -
AR0091 #11 Y:1996 Lease / purchase baler; sell cardboard to recycler $39,367 $8,000