49
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
BD0189 #11 Y:2001 | 11 | 2001 | Lease / purchase baler; sell cardboard to recycler | $1,680 | $300 | |
BD0189 #10 Y:2001 | 10 | 2001 | Add equipment/ operators to reduce production bottleneck | $15,750 | $2,000 | |
BD0189 #09 Y:2001 | 09 | 2001 | Automate payroll system | $19,000 | $18,000 | |
BD0189 #08 Y:2001 | 08 | 2001 | Minimize water usage | $429 | $1,550 | |
BD0189 #07 Y:2001 | 07 | 2001 | Minimize water usage | $1,633 | $100 | |
BD0189 #06 Y:2001 | 06 | 2001 | Install / repair insulation on steam lines | $397 | $1,050 | |
BD0189 #05 Y:2001 | 05 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $501 | $1,300 | |
BD0189 #04 Y:2001 | 04 | 2001 | Reduce the pressure of compressed air to the minimum required | $1,134 | - | |
BD0189 #03 Y:2001 | 03 | 2001 | Install occupancy sensors | $1,612 | $1,000 | |
BD0189 #02 Y:2001 | 02 | 2001 | Install compressor air intakes in coolest locations | $1,676 | $1,875 | |
BD0189 #01 Y:2001 | 01 | 2001 | Use most efficient type of electric motors | $2,697 | $10,450 | |
KU0486 #09 Y:1997 | 09 | 1997 | Cover containers to minimize evaporative losses | $590 | $170 | |
KU0486 #08 Y:1997 | 08 | 1997 | Recycle waste ink and cleanup solvent | $3,180 | - | |
KU0486 #07 Y:1997 | 07 | 1997 | Install occupancy sensors | $1,560 | $1,150 | |
KU0486 #06 Y:1997 | 06 | 1997 | Install vinyl strip / high speed / air curtain doors | $2,020 | $2,980 | |
KU0486 #05 Y:1997 | 05 | 1997 | Use adjustable frequency drive or multiple speed motors on existing system | $2,990 | $10,200 | |
KU0486 #04 Y:1997 | 04 | 1997 | Replace electrically-operated equipment with fossil fuel equipment | $4,080 | $9,220 | |
KU0486 #03 Y:1997 | 03 | 1997 | Install compressor air intakes in coolest locations | $4,010 | $790 | |
KU0486 #02 Y:1997 | 02 | 1997 | Use most efficient type of electric motors | $4,710 | $13,580 | |
KU0486 #01 Y:1997 | 01 | 1997 | Insulate bare equipment | $12,940 | $11,560 |