ITAC Assessment: BD0189
ITAC logo
ITAC Assessment: BD0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Rubber and PVC Safety Footwear
NAICS
n/a
SIC 3021: Rubber and Plastics Footwear
Sales Range $50
M
to 100
M
# of Employees 324
Plant Area 300,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,785 5,997,040
kWh
Electricity Demand $116,955 17,935
kW-mo/yr
Electricity Fees $34,924 -
Natural Gas $174,491 38,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $2,697 $10,450 $1,540
49,203
kWh
$1,157
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $1,676 $1,875 $1,302
41,603
kWh
$374
-
kW-mo/yr
- - - - -
03 2.7135: Install occupancy sensors $1,612 $1,000 $811
25,905
kWh
$801
-
kW-mo/yr
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,134 - $567
18,128
kWh
$567
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $501 $1,300 $251
8,028
kWh
$250
-
kW-mo/yr
- - - - -
06 2.2136: Install / repair insulation on steam lines $397 $1,050 - - $397
-
MMBtu
- - - -
07 3.4151: Minimize water usage $1,633 $100 - - - $1,633
-
Tgal
- - -
08 3.4151: Minimize water usage $429 $1,550 - - - $429
-
Tgal
- - -
09 4.447: Automate payroll system $19,000 $18,000 - - - - - $19,000 -
10 4.111: Add equipment/ operators to reduce production bottleneck $15,750 $2,000 - - - - - - $15,750
11 3.5315: Lease / purchase baler; sell cardboard to recycler $1,680 $300 - - - - $1,680
-
lb
- -
TOTAL RECOMMENDED $46,509 $37,625 $4,471
142,867
kWh
$3,149
-
kW-mo/yr
$397
-
MMBtu
$2,062
-
Tgal
$1,680
-
lb
$19,000 $15,750
TOTAL IMPLEMENTED $17,812 $3,650 - - - $2,062
-
Tgal
- - $15,750
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs