Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Cylindrical Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,527 738,240
kWh
Electricity Demand $11,312 1,592
kW-mo/yr
Electricity Fees $2,496 -
Natural Gas $15,256 1,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,757 $5,244 $2,032
56,588
kWh
$725
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $302 $528 $158
4,404
kWh
$144
-
kW-mo/yr
- -
03 2.7144: Install spectral reflectors / delamp $1,207 $30 $887
24,707
kWh
$320
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $324 $225 $239
6,661
kWh
$85
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $437 $1,000 - - $437
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,431 $200 $1,055
29,375
kWh
$376
-
kW-mo/yr
- -
07 2.7231: Use radiant heater for spot heating $4,341 $5,300 - - $4,341
-
MMBtu
-
08 2.4133: Use most efficient type of electric motors $2,315 $3,150 $1,706
47,515
kWh
$609
-
kW-mo/yr
- -
09 3.3131: Use evaporation to concentrate material $6,150 $7,400 - - - $6,150
-
Tgal
TOTAL RECOMMENDED $19,264 $23,077 $6,077
169,250
kWh
$2,259
-
kW-mo/yr
$4,778
-
MMBtu
$6,150
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs