| Assessment Year | 2008 |
|---|---|
| Principal Product | Cylindrical Parts |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 60 |
| Plant Area |
40,000
ft2
|
| Annual Production | 12,000,000
pieces
|
| Production Hrs. Annual | 6,656
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $26,527 | 738,240 |
kWh
|
$0.036 |
| Electricity Demand | $11,312 | 1,592 |
kW-mo/yr
|
$7.11 |
| Electricity Fees | $2,496 | - |
|
- |
| Natural Gas | $15,256 | 1,513 |
MMBtu
|
$10.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,264 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,757 | $5,244 |
$2,032
56,588
kWh
|
$725
-
kW-mo/yr
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $302 | $528 |
$158
4,404
kWh
|
$144
-
kW-mo/yr
|
- | - | |
| 03 | 2.7144: Install spectral reflectors / delamp | $1,207 | $30 |
$887
24,707
kWh
|
$320
-
kW-mo/yr
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $324 | $225 |
$239
6,661
kWh
|
$85
-
kW-mo/yr
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $437 | $1,000 | - | - |
$437
-
MMBtu
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,431 | $200 |
$1,055
29,375
kWh
|
$376
-
kW-mo/yr
|
- | - | |
| 07 | 2.7231: Use radiant heater for spot heating | $4,341 | $5,300 | - | - |
$4,341
-
MMBtu
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $2,315 | $3,150 |
$1,706
47,515
kWh
|
$609
-
kW-mo/yr
|
- | - | |
| 09 | 3.3131: Use evaporation to concentrate material | $6,150 | $7,400 | - | - | - |
$6,150
-
Tgal
|
|
| TOTAL RECOMMENDED | $19,264 | $23,077 |
$6,077
169,250
kWh
|
$2,259
-
kW-mo/yr
|
$4,778
-
MMBtu
|
$6,150
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs