261
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Tires and inner tubes | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0325 #11 Y:2024 | 11 | 2024 | Use most efficient type of electric motors | $718 | $2,640 |
n/a
|
TT0325 #10 Y:2024 | 10 | 2024 | Meter waste water | $1,047 | $1,100 |
n/a
|
TT0325 #09 Y:2024 | 09 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,955 | $1,000 |
n/a
|
TT0325 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $4,068 | $15,000 |
n/a
|
TT0325 #07 Y:2024 | 07 | 2024 | Eliminate or reduce compressed air usage | $5,049 | $30,040 |
n/a
|
TT0325 #06 Y:2024 | 06 | 2024 | Turn off equipment when not in use | $5,854 | $400 |
n/a
|
TT0325 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,974 | $16,000 |
n/a
|
TT0325 #04 Y:2024 | 04 | 2024 | Use heat from boiler blowdown to preheat boiler feed water | $8,824 | $22,500 |
n/a
|
TT0325 #03 Y:2024 | 03 | 2024 | Preheat boiler makeup water with waste process heat | $30,978 | $17,480 |
n/a
|
TT0325 #02 Y:2024 | 02 | 2024 | Install smaller boiler (increase high fire duty cycle) | $68,822 | $200,000 |
n/a
|
TT0325 #01 Y:2024 | 01 | 2024 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $242,348 | $1,045,217 |
n/a
|
TT0317 #16 Y:2024 | 16 | 2024 | Upgrade obsolete equipment | $4,116 | $50,000 |
n/a
|
TT0317 #15 Y:2024 | 15 | 2024 | Eliminate or reduce compressed air usage | $8,295 | $40,000 |
n/a
|
TT0317 #14 Y:2024 | 14 | 2024 | Utilize higher efficiency lamps and/or ballasts | $698 | $2,910 |
n/a
|
TT0317 #13 Y:2024 | 13 | 2024 | Adopt in-house material generation | $205,758 | $600,000 |
n/a
|
TT0317 #12 Y:2024 | 12 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,299 | $16,125 |
n/a
|
TT0317 #11 Y:2024 | 11 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $22,558 | $39,000 |
n/a
|
TT0317 #10 Y:2024 | 10 | 2024 | Minimize boiler blowdown with better feedwater treatment | $56,902 | $80,000 |
n/a
|
TT0317 #09 Y:2024 | 09 | 2024 | Upgrade controls on compressors | $6,847 | $8,500 |
n/a
|
TT0317 #08 Y:2024 | 08 | 2024 | Initiate a program to acquire iso certification | $64,353 | $60,000 |
n/a
|