Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,782

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and miscellaneous plastics products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0816 #08 Y:2010 Insulate bare equipment $6,179 -
UD0816 #07 Y:2010 Insulate bare equipment $346 -
UD0816 #06 Y:2010 Insulate bare equipment $22,144 -
UD0816 #05 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $4,108 -
UD0816 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $8,929 -
UD0816 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $17,881 -
UD0816 #02 Y:2010 Turn off equipment during breaks, reduce operating time $1,468 -
UD0816 #01 Y:2010 Optimize plant power factor $2,978 -
UD0809 #19 Y:2009 Use waste heat from hot flue gases to preheat $181 $500
UD0809 #18 Y:2009 Chill water to the highest temperature possible $363 -
UD0809 #17 Y:2009 Turn off equipment when not in use $414 -
UD0809 #16 Y:2009 Disconnect ballasts $532 -
UD0809 #15 Y:2009 Reduce the pressure of compressed air to the minimum required $685 -
UD0809 #14 Y:2009 Utilize daylight whenever possible in lieu of artificial light $2,678 $5,467
UD0809 #13 Y:2009 Utilize higher efficiency lamps and/or ballasts $1,348 $1,703
UD0809 #12 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $1,411 $8,270
UD0809 #11 Y:2009 Eliminate leaks in water lines and valves $1,858 $480
UD0809 #10 Y:2009 Utilize higher efficiency lamps and/or ballasts $2,765 $1,048
UD0809 #09 Y:2009 Insulate bare equipment $2,822 $1,440
UD0809 #08 Y:2009 Utilize controls to operate equipment only when needed $4,116 $23,400