Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carbon black
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0258 #07 Y:2006 Reduce illumination to minimum necessary levels $755 $432
LL0258 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $6,321 $3,850
LL0258 #05 Y:2006 Install occupancy sensors $18,294 $2,190
LL0258 #04 Y:2006 Use photocell controls $27,638 $4,050
LL0258 #03 Y:2006 Reduce space conditioning during non-working hours $65,870 $8,195
LL0258 #02 Y:2006 Use photocell controls $68,323 $3,630
LL0258 #01 Y:2006 Install equipment to utilize waste fuel $3,668,421 $1,500,000
LL0242 #11 Y:2005 Insulate bare equipment $375 $144
LL0242 #10 Y:2005 Utilize higher efficiency lamps and/or ballasts $629 $455
LL0242 #09 Y:2005 Install occupancy sensors $1,427 $180
LL0242 #08 Y:2005 Reduce illumination to minimum necessary levels $2,097 $402
LL0242 #07 Y:2005 Utilize higher efficiency lamps and/or ballasts $4,225 $4,449
LL0242 #06 Y:2005 Insulate bare equipment $4,232 $323
LL0242 #05 Y:2005 Add area lighting switches $4,742 $1,301
LL0242 #04 Y:2005 Reduce the pressure of compressed air to the minimum required $8,984 $30
LL0242 #03 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $70,930 $25,280
LL0242 #02 Y:2005 Use waste heat to produce steam to drive a steam turbine-generator $1,416,308 $4,140,000
LL0242 #01 Y:2005 Install equipment to utilize waste fuel $2,751,316 $250,000
OK0710 #08 Y:2005 Utilize higher efficiency lamps and/or ballasts $298 $895
OK0710 #07 Y:2005 Reschedule plant operations or reduce load to avoid peaks $729 $30