26
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Carbon black | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LL0258 #07 Y:2006 | 07 | 2006 | Reduce illumination to minimum necessary levels | $755 | $432 | |
LL0258 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $6,321 | $3,850 | |
LL0258 #05 Y:2006 | 05 | 2006 | Install occupancy sensors | $18,294 | $2,190 | |
LL0258 #04 Y:2006 | 04 | 2006 | Use photocell controls | $27,638 | $4,050 | |
LL0258 #03 Y:2006 | 03 | 2006 | Reduce space conditioning during non-working hours | $65,870 | $8,195 | |
LL0258 #02 Y:2006 | 02 | 2006 | Use photocell controls | $68,323 | $3,630 | |
LL0258 #01 Y:2006 | 01 | 2006 | Install equipment to utilize waste fuel | $3,668,421 | $1,500,000 | |
LL0242 #11 Y:2005 | 11 | 2005 | Insulate bare equipment | $375 | $144 | |
LL0242 #10 Y:2005 | 10 | 2005 | Utilize higher efficiency lamps and/or ballasts | $629 | $455 | |
LL0242 #09 Y:2005 | 09 | 2005 | Install occupancy sensors | $1,427 | $180 | |
LL0242 #08 Y:2005 | 08 | 2005 | Reduce illumination to minimum necessary levels | $2,097 | $402 | |
LL0242 #07 Y:2005 | 07 | 2005 | Utilize higher efficiency lamps and/or ballasts | $4,225 | $4,449 | |
LL0242 #06 Y:2005 | 06 | 2005 | Insulate bare equipment | $4,232 | $323 | |
LL0242 #05 Y:2005 | 05 | 2005 | Add area lighting switches | $4,742 | $1,301 | |
LL0242 #04 Y:2005 | 04 | 2005 | Reduce the pressure of compressed air to the minimum required | $8,984 | $30 | |
LL0242 #03 Y:2005 | 03 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $70,930 | $25,280 | |
LL0242 #02 Y:2005 | 02 | 2005 | Use waste heat to produce steam to drive a steam turbine-generator | $1,416,308 | $4,140,000 | |
LL0242 #01 Y:2005 | 01 | 2005 | Install equipment to utilize waste fuel | $2,751,316 | $250,000 | |
OK0710 #08 Y:2005 | 08 | 2005 | Utilize higher efficiency lamps and/or ballasts | $298 | $895 | |
OK0710 #07 Y:2005 | 07 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $729 | $30 |