ITAC Assessment: LL0258
ITAC logo
ITAC Assessment: LL0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Carbon Black
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2895: Carbon Black
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 140,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,228,265 61,844,550
kWh
Electricity Demand $753,234 101,939
kW-mo/yr
Electricity Fees $184,944 -
Natural Gas $19,016,134 2,048,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,855,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.1336: Install equipment to utilize waste fuel $3,668,421 $1,500,000 - - - $3,668,421
-
MMBtu
-
02 2.7134: Use photocell controls $68,323 $3,630 $65,883
963,203
kWh
- $2,440 - -
03 2.7224: Reduce space conditioning during non-working hours $65,870 $8,195 $63,517
928,612
kWh
- $2,353 - -
04 2.7134: Use photocell controls $27,638 $4,050 $26,651
389,631
kWh
- $987 - -
05 2.7135: Install occupancy sensors $18,294 $2,190 $17,641
257,904
kWh
- $653 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,321 $3,850 $2,505
36,617
kWh
$370
-
kW-mo/yr
$106 - $3,340
07 2.7111: Reduce illumination to minimum necessary levels $755 $432 $447
6,529
kWh
$281
-
kW-mo/yr
$27 - -
TOTAL RECOMMENDED $3,855,622 $1,522,347 $176,644
2,582,496
kWh
$651
-
kW-mo/yr
$6,566 $3,668,421
-
MMBtu
$3,340
TOTAL IMPLEMENTED $95,961 $7,680 $92,534
1,352,834
kWh
- $3,427 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs