1,663
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0298 #12 Y:2026 | 12 | 2026 | Reduce ventilation air | $140 | $120 |
n/a
|
| UU0298 #11 Y:2026 | 11 | 2026 | Pay bills on time to avoid late fees | $314 | $240 |
n/a
|
| UU0298 #10 Y:2026 | 10 | 2026 | Install compressor air intakes in coolest locations | $1,100 | $6,160 |
n/a
|
| UU0298 #09 Y:2026 | 09 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,524 | $6,695 |
n/a
|
| UU0298 #08 Y:2026 | 08 | 2026 | Turn off equipment during breaks, reduce operating time | $3,869 | $18,600 |
n/a
|
| UU0298 #07 Y:2026 | 07 | 2026 | Apply for tax-free status for energy purchases | $4,506 | $4,800 |
n/a
|
| UU0298 #06 Y:2026 | 06 | 2026 | Use hot process fluids to preheat incoming process fluids | $5,332 | $21,000 |
n/a
|
| UU0298 #05 Y:2026 | 05 | 2026 | Utilize controls to operate equipment only when needed | $7,570 | $4,800 |
n/a
|
| UU0298 #04 Y:2026 | 04 | 2026 | Eliminate or reduce compressed air usage | $9,030 | $9,030 |
n/a
|
| UU0298 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,430 | $3,600 |
n/a
|
| UU0298 #02 Y:2026 | 02 | 2026 | Upgrade controls on compressors | $19,350 | $5,880 |
n/a
|
| UU0298 #01 Y:2026 | 01 | 2026 | Turn off equipment when not in use | $33,940 | $3,375 |
n/a
|
| UD1128 #07 Y:2026 | 07 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,966 | $828 |
n/a
|
| UD1128 #06 Y:2026 | 06 | 2026 | Turn off equipment when not in use | $8,922 | - |
n/a
|
| UD1128 #05 Y:2026 | 05 | 2026 | Install vinyl strip / high speed / air curtain doors | $172 | $600 |
n/a
|
| UD1128 #04 Y:2026 | 04 | 2026 | Reduce ventilation air | $31,291 | - |
n/a
|
| UD1128 #03 Y:2026 | 03 | 2026 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,524 | - |
n/a
|
| UD1128 #02 Y:2026 | 02 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $24,321 | - |
n/a
|
| UD1128 #01 Y:2026 | 01 | 2026 | Change rate schedules or other changes in utility service | $29,465 | - |
n/a
|
| MZ0386 #09 Y:2025 | 09 | 2025 | Lower temperature during the winter season and vice-versa | $2,220 | $1,050 |
n/a
|