18
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Cyclic organic crudes and intermediates, and organic dyes and pigments | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0450 #13 Y:2012 | 13 | 2012 | Install compressor air intakes in coolest locations | $2,764 | $1,800 | |
| WV0450 #12 Y:2012 | 12 | 2012 | Install outside air damper / economizer on hvac unit | $7,314 | $3,360 | |
| WV0450 #11 Y:2012 | 11 | 2012 | Develop a repair/replace policy | $8,489 | $1,210 | |
| WV0450 #10 Y:2012 | 10 | 2012 | Utilize higher efficiency lamps and/or ballasts | $8,953 | $18,267 | |
| WV0450 #09 Y:2012 | 09 | 2012 | Use waste heat from hot flue gases to preheat | $9,686 | $21,120 | |
| WV0450 #08 Y:2012 | 08 | 2012 | Establish a predictive maintenance program | $10,199 | $1,000 | |
| WV0450 #07 Y:2012 | 07 | 2012 | Install timers on light switches in little used areas | $11,389 | $6,500 | |
| WV0450 #06 Y:2012 | 06 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $36,667 | $21,800 | |
| WV0450 #05 Y:2012 | 05 | 2012 | Use waste heat to produce steam to drive a steam turbine-generator | $97,121 | $400,000 | |
| WV0450 #04 Y:2012 | 04 | 2012 | Redesign process | $102,043 | $230,000 | |
| WV0450 #03 Y:2012 | 03 | 2012 | Use waste heat from hot flue gases to preheat | $130,899 | $157,320 | |
| WV0450 #02 Y:2012 | 02 | 2012 | Use waste heat from hot flue gases to generate steam | $141,590 | $210,000 | |
| WV0450 #01 Y:2012 | 01 | 2012 | Analyze flue gas for proper air/fuel ratio | $173,557 | $1,000 | |
| LE0163 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $1,258 | - | |
| LE0163 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $1,773 | - | |
| LE0163 #03 Y:2003 | 03 | 2003 | Install / repair insulation on steam lines | $5,429 | $1,434 | |
| LE0163 #02 Y:2003 | 02 | 2003 | Insulate bare equipment | $11,718 | $9,072 | |
| LE0163 #01 Y:2003 | 01 | 2003 | Insulate bare equipment | $16,944 | $40,000 |