Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cyclic organic crudes and intermediates, and organic dyes and pigments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0628 #09 Y:2012 Use synthetic lubricant $240 -
AM0628 #08 Y:2012 Utilize daylight whenever possible in lieu of artificial light $520 -
AM0628 #07 Y:2012 Insulate feedwater tank $820 $455
AM0628 #06 Y:2012 Install skylights $1,525 -
AM0628 #05 Y:2012 Reduce the pressure of compressed air to the minimum required $2,870 $35
AM0628 #04 Y:2012 Install skylights $3,300 $5,300
AM0628 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,960 $20
AM0628 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $6,150 $11,100
AM0628 #01 Y:2012 Analyze flue gas for proper air/fuel ratio $15,700 $675
AM0402 #11 Y:2001 Make a practice of turning off lights when not needed $4,010 -
AM0402 #10 Y:2001 Reschedule plant operations or reduce load to avoid peaks $4,325 -
AM0402 #09 Y:2001 Turn off equipment during breaks, reduce operating time $8,200 -
AM0402 #08 Y:2001 Use most efficient type of electric motors $10,700 $3,300
AM0402 #07 Y:2001 Use synthetic lubricant $11,100 -
AM0402 #06 Y:2001 Insulate bare equipment $19,300 $865
AM0402 #05 Y:2001 Use adjustable frequency drive or multiple speed motors on existing system $26,070 $53,700
AM0402 #04 Y:2001 Repair and eliminate steam leaks $27,400 $1,000
AM0402 #03 Y:2001 Increase amount of condensate returned $61,175 $15,000
AM0402 #02 Y:2001 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $248,500 $1,730,000
AM0402 #01 Y:2001 Repair or replace steam traps $632,000 $1,210