Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Perfumes, cosmetics, and other toilet preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0475 #04 Y:2019 Reduce / eliminate use of disposable product $2,515 $7,906
AS0475 #03 Y:2019 Reschedule plant operations or reduce load to avoid peaks $2,779 $895
AS0475 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $3,094 $5,938
AS0475 #01 Y:2019 Replace existing hvac unit with high efficiency model $4,577 $20,083
IP0113 #13 Y:2018 Use waste heat from hot flue gases to preheat $4,555 $21,000
IP0113 #12 Y:2018 Recover waste heat from equipment $892 $2,129
IP0113 #11 Y:2018 Utilize higher efficiency lamps and/or ballasts $476 $1,343
IP0113 #10 Y:2018 Utilize controls to operate equipment only when needed $775 $765
IP0113 #09 Y:2018 Optimize plant power factor $1,564 $876
IP0113 #08 Y:2018 Install occupancy sensors $591 $501
IP0113 #07 Y:2018 Use photocell controls $151 $71
IP0113 #06 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $1,196 $72
IP0113 #05 Y:2018 Use or replace with energy efficient substitutes $629 -
IP0113 #04 Y:2018 Change rate schedules or other changes in utility service $783 -
IP0113 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $1,595 $4
IP0113 #02 Y:2018 Combine utility meters $1,625 -
IP0113 #01 Y:2018 Lower temperature during the winter season and vice-versa $2,753 -
MI0328 #11 Y:2017 Insulate bare equipment $1,011 $206
MI0328 #10 Y:2017 Use photocell controls $1,016 $2,773
MI0328 #09 Y:2017 Eliminate or reduce compressed air usage $1,121 $1,501