Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics materials, synthetic resins, and nonvulcanizable elastomers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0505 #08 Y:2016 Repair and eliminate steam leaks $4,554 $1,592
UF0505 #07 Y:2016 Preheat boiler makeup water with waste process heat $7,374 $4,000
UF0505 #06 Y:2016 Repair and eliminate steam leaks $7,831 $1,081
UF0505 #05 Y:2016 Install turbulators $12,705 $7,500
UF0505 #04 Y:2016 Establish a preventative maintenance program $13,763 $120
UF0505 #03 Y:2016 Increase amount of condensate returned $18,902 $2,800
UF0505 #02 Y:2016 Replace boiler $152,736 $200,000
UF0505 #01 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $715,231 $1,700,000
SU0432 #07 Y:2016 Conserve energy by efficient use of vending machines $115 $551
SU0432 #06 Y:2016 Utilize higher efficiency lamps and/or ballasts $14,489 $22,737
SU0432 #05 Y:2016 Install compressor air intakes in coolest locations $4,680 $5,451
SU0432 #04 Y:2016 Install occupancy sensors $906 $968
SU0432 #03 Y:2016 Eliminate/reduce an operation $22,179 $350
SU0432 #02 Y:2016 Disconnect ballasts $1,881 -
SU0432 #01 Y:2016 Reduce the pressure of compressed air to the minimum required $2,735 -
AM0718 #05 Y:2016 Install timers on light switches in little used areas $10,555 $1,800
AM0718 #04 Y:2016 Use synthetic lubricant $28,832 -
AM0718 #03 Y:2016 Use steam pressure reduction to generate power $65,900 $400,000
AM0718 #02 Y:2016 Optimize plant power factor $53,431 $280,072
AM0718 #01 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $123,800 $195,000