1,297
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Plastics materials, synthetic resins, and nonvulcanizable elastomers | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1130 #09 Y:2026 | 09 | 2026 | Install occupancy sensors | $728 | $393 |
n/a
|
| UD1130 #08 Y:2026 | 08 | 2026 | Disconnect ballasts | $901 | $300 |
n/a
|
| UD1130 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $996 | $759 |
n/a
|
| UD1130 #06 Y:2026 | 06 | 2026 | Reduce the pressure of compressed air to the minimum required | $6,540 | $5,408 |
n/a
|
| UD1130 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,951 | $953 |
n/a
|
| UD1130 #04 Y:2026 | 04 | 2026 | Install motor voltage controller on lightly loaded motors | $10,947 | $3,607 |
n/a
|
| UD1130 #03 Y:2026 | 03 | 2026 | Install / repair insulation on steam lines | $2,206 | $633 |
n/a
|
| UD1130 #02 Y:2026 | 02 | 2026 | Increase amount of condensate returned | $7,277 | $7,899 |
n/a
|
| UD1130 #01 Y:2026 | 01 | 2026 | Repair or replace steam traps | $59,632 | $9,336 |
n/a
|
| MS0457 #03 Y:2025 | 03 | 2025 | Replace obsolete burners with more efficient ones | $56,120 | $321,000 |
n/a
|
| MS0457 #02 Y:2025 | 02 | 2025 | Replace fossil fuel equipment with electrical equipment | $5,498 | $75,000 |
n/a
|
| MS0457 #01 Y:2025 | 01 | 2025 | Upgrade obsolete equipment | $6,840 | $29,366 |
n/a
|
| KS2543 #06 Y:2025 | 06 | 2025 | Use waste heat from hot flue gases to preheat | $40,710 | $75,751 |
n/a
|
| KS2543 #05 Y:2025 | 05 | 2025 | Replace boiler | $36,384 | $322,039 |
n/a
|
| KS2543 #04 Y:2025 | 04 | 2025 | Recover heat from exhausted steam, hot air or hot water | $2,351 | $7,071 |
n/a
|
| KS2543 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,131 | $60 |
n/a
|
| KS2543 #02 Y:2025 | 02 | 2025 | Replace existing hvac unit with high efficiency model | $64,473 | $494,771 |
n/a
|
| KS2543 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $136,651 | $1,120,140 |
n/a
|
| UL2512 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $32,508 | $321,604 |
n/a
|
| UL2512 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,101 | $4,725 |
n/a
|