| Assessment Year | 2026 |
|---|---|
| Principal Product | Automotive parts |
| NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 127 |
| Plant Area |
141,180
ft2
|
| Annual Production | 12,816,894
units
|
| Production Hrs. Annual | 4,200
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $283,228 | 4,095,600 |
kWh
|
$0.069 |
| Electricity Demand | $63,192 | 9,092 |
kW-mo/yr
|
$6.95 |
| Electricity Fees | $58,070 | - |
|
- |
| Natural Gas | $11,613 | 1,813 |
MMBtu
|
$6.41 |
| Other Gas | $2,973 | 1 |
MMBtu
|
$2,973.00 |
| TOTAL YEARLY COSTS | $419,076 | |||
| RECOMMENDED SAVINGS* | $124,516 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,794 | - |
$1,794
25,947
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,372 | $1,080 |
$2,372
34,306
kWh
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $343 | $1,000 |
$343
4,952
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,101 | $1,378 |
$762
11,023
kWh
|
$339
-
kW-mo/yr
|
|
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,531 | - |
$1,236
17,880
kWh
|
$295
-
kW-mo/yr
|
|
| 06 | 2.7135: Install occupancy sensors | $853 | $1,256 |
$853
12,332
kWh
|
- | |
| 07 | 2.9114: Use solar heat to make electricty | $87,553 | $750,915 |
$74,012
1,070,244
kWh
|
$13,541
-
kW-mo/yr
|
|
| 08 | 2.7292: Lower ceiling to reduce conditioned space | $12,939 | $40,000 |
$12,939
186,981
kWh
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,560 | - |
$1,560
22,549
kWh
|
- | |
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,085 | $8,385 |
$10,085
145,734
kWh
|
- | |
| 11 | 2.2522: Isolate hot or cold equipment | $4,385 | $20,000 |
$4,385
63,367
kWh
|
- | |
| TOTAL RECOMMENDED | $124,516 | $824,014 |
$110,341
1,595,315
kWh
|
$14,175
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||