ITAC Assessment: MO0209
ITAC logo
ITAC Assessment: MO0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Drilling Rigs and Tools
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 210,000
ft2
Annual Production 300
ton
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,936 2,579,426
kWh
Electricity Demand $17,656 756
kW-mo/yr
Electricity Fees $18,029 -
Natural Gas $38,645 8,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $7,160 $20,000 - - - $7,160
02 4.514: Re-arrange equipment layout to reduce handling costs $10,500 $12,500 - - - $10,500
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,205 $6,224 $2,824
47,773
kWh
$381
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,289 $1,942 $1,137
19,050
kWh
$152
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $530 $59 $483
8,206
kWh
$47
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $258 $40 $235
4,103
kWh
$23
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $2,252 $3,564 $2,021
33,998
kWh
$231
-
kW-mo/yr
- -
08 2.4321: Upgrade obsolete equipment $49,474 $85,000 - - $49,474
-
lb
-
09 3.7196: Use re-usable filters $2,231 $1,817 - - $2,231
-
lb
-
TOTAL RECOMMENDED $76,899 $131,146 $6,700
113,130
kWh
$834
-
kW-mo/yr
$51,705
-
lb
$17,660
TOTAL IMPLEMENTED $1,289 $1,942 $1,137
19,050
kWh
$152
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs