Assessment Year | 1997 |
---|---|
Principal Product | Drilling Rigs and Tools |
NAICS |
n/a
|
SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
210,000
ft2
|
Annual Production | 300
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,936 | 2,579,426 |
kWh
|
$0.052 |
Electricity Demand | $17,656 | 756 |
kW-mo/yr
|
$23.35 |
Electricity Fees | $18,029 | - |
|
- |
Natural Gas | $38,645 | 8,896 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.432: Cross-train personnel to avoid lost time | $7,160 | $20,000 | - | - | - | $7,160 | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $10,500 | $12,500 | - | - | - | $10,500 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,205 | $6,224 |
$2,824
47,773
kWh
|
$381
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,289 | $1,942 |
$1,137
19,050
kWh
|
$152
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $530 | $59 |
$483
8,206
kWh
|
$47
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $258 | $40 |
$235
4,103
kWh
|
$23
-
kW-mo/yr
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $2,252 | $3,564 |
$2,021
33,998
kWh
|
$231
-
kW-mo/yr
|
- | - | |
08 | 2.4321: Upgrade obsolete equipment | $49,474 | $85,000 | - | - |
$49,474
-
lb
|
- | |
09 | 3.7196: Use re-usable filters | $2,231 | $1,817 | - | - |
$2,231
-
lb
|
- | |
TOTAL RECOMMENDED | $76,899 | $131,146 |
$6,700
113,130
kWh
|
$834
-
kW-mo/yr
|
$51,705
-
lb
|
$17,660 | ||
TOTAL IMPLEMENTED | $1,289 | $1,942 |
$1,137
19,050
kWh
|
$152
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs