Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics materials and synthetic resins, synthetic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0457 #03 Y:2025 Replace obsolete burners with more efficient ones $56,120 $321,000
MS0457 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $5,498 $75,000
MS0457 #01 Y:2025 Upgrade obsolete equipment $6,840 $29,366
KS2543 #06 Y:2025 Use waste heat from hot flue gases to preheat $40,710 $75,751
KS2543 #05 Y:2025 Replace boiler $36,384 $322,039
KS2543 #04 Y:2025 Recover heat from exhausted steam, hot air or hot water $2,351 $7,071
KS2543 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $2,131 $60
KS2543 #02 Y:2025 Replace existing hvac unit with high efficiency model $64,473 $494,771
KS2543 #01 Y:2025 Use solar heat to make electricty $136,651 $1,120,140
UL2512 #06 Y:2025 Use solar heat to make electricty $32,508 $321,604
UL2512 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,101 $4,725
UL2512 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $965 $525
UL2512 #03 Y:2025 Use outside cold water source as a supply of cooling water $32,007 $43,234
UL2512 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,935 $5,846
UL2512 #01 Y:2025 Install occupancy sensors $1,784 $3,182
MU0067 #14 Y:2025 Lower temperature during the winter season and vice-versa $56 -
MU0067 #13 Y:2025 Utilize higher efficiency lamps and/or ballasts $416 $137
MU0067 #12 Y:2025 Install occupancy sensors $215 $134
MU0067 #11 Y:2025 Use photocell controls $101 $237
MU0067 #10 Y:2025 Install timers on light switches in little used areas $188 $178